春季施工中须要注重哪些事变?

所属分类:公司消息 宣布时候:2020-12-17 来历:众富购彩:http://vncarmart.net 阅读量:18

1、振捣体例
1. Vibration mode
在施工进程中应答混凝土停止充实振捣,做到不漏振,不过振。对混凝土过振构成份层离析、外表浮浆,导致混凝本地货生不平均沉降缩短,在布局厚薄交壤处呈现裂痕。漏振倒霉于混凝土密实,构成混凝土蜂窝、麻面等缺点。混凝土振捣应按照混凝土任务性,肯定振捣时候。混凝土应充实振捣,其标记是:混凝土外表呈现浆体,不气泡溢出,混凝土布满试模,不在明显下沉。
In the construction process, the concrete should be fully vibrated to ensure that there is no missing vibration but no vibration. The excessive vibration of concrete results in layered segregation and floating slurry on the surface, resulting in uneven settlement and shrinkage of concrete and cracks at the junction of thickness and thickness of the structure. Leakage vibration is not conducive to concrete compaction, resulting in concrete honeycomb, pitted surface and other defects. The concrete vibration time shall be determined according to the workability of concrete. The concrete should be fully vibrated, and its signs are: the slurry appears on the surface of the concrete, there is no bubble overflow, the concrete is full of the test mold, and there is no significant subsidence.
2、二次振捣和屡次抹面
2. Secondary vibration and multiple plastering
施工职员应按照商品混凝土的特色,商品混凝土坍落度比拟大,固结时候比拟长(普通8~12h),应做好二次振捣和抹压,使塑性缩短裂痕实时充实愈合。接纳二次振捣能够消弭因塑性沉降而引发的内分层,阻断因泌水而留下的联贯通道,改良骨料界面布局,进步混凝土强度和抗渗入才能。
According to the characteristics of commercial concrete, the slump of commercial concrete is relatively large, and the setting time is relatively long (generally 8-12h). The secondary vibration and plastering pressure should be done well to make the plastic shrinkage cracks fully heal in time. The secondary vibration can eliminate the internal delamination caused by plastic settlement, block the continuous channel left by bleeding, improve the interface structure of aggregate, and improve the strength and permeability of concrete.
在枯燥的春季,混凝土掺了缓凝减水剂后,外表被风干,水份蒸发很快,外表构成一层“硬壳”。当气温较高并蒸发量大时,应接纳边喷水雾的体例,能够处置混凝土“结壳”的景象。
In the dry spring, the surface of concrete is dried by air after adding high efficiency retarding and water reducing agent, and the water evaporates quickly, forming a layer of "hard shell" on the surface. When the air temperature is high and the evaporation is large, the method of spraying water at the same time should be adopted to solve the problem of concrete "crusting".
3、现场养护
3. On site maintenance
混凝土浇筑后,若外表不实时笼盖、浇水养护,外表水份敏捷蒸发,很轻易发生缩短裂痕。出格在绝对湿度低、风速大的环境下,干缩更轻易发生。有材料标明,当风速为16m/s时,混凝土中的水份蒸发速率为无风时的四倍。
After the concrete pouring, if the surface is not covered and watered in time, the surface moisture will evaporate rapidly, which is easy to produce shrinkage cracks. Especially in the case of low relative humidity and high wind speed, drying shrinkage is more likely to occur. Some data show that when the wind speed is 16m / s, the evaporation rate of water in concrete is four times of that in the absence of wind.
今朝,有些施工工地在浇筑混凝土时,不能做到实时笼盖保温养护。普通总要比及一遍抹光竣事后才笼盖,另有很多多少工地底子不笼盖,或只是派人隔几小时去浇一次水。在次抹平后,当即用塑料薄膜笼盖,不让水份蒸发掉,依托混凝土本身的水份停止保湿养护。需停止第二次抹光时,揭开薄膜,抹完了仍要笼盖好。保湿养护不得少于7d,抗渗等有出格请求全主动上料搅拌车的工程养护时候不少于14d。
 
At present, some construction sites are unable to cover and maintain insulation in time when pouring concrete. Generally, it is necessary to wait until the last finishing time before covering. There are many construction sites that are not covered at all, or only send people to water every few hours. After the first troweling, the concrete shall be covered with plastic film immediately to prevent water from evaporating, and the concrete shall be kept moist by its own moisture. When the second troweling is needed, the film shall be uncovered and covered after finishing. The moisturizing curing time shall not be less than 7d, and the curing time of impermeability and other special requirements shall not be less than 14d.
4、拆模的时候
4. Time of formwork removal
混凝土拆模时,要注重拆模的时候及挨次。对梁、墙板等布局应恰当耽误拆模时候,拆模后应持续采用办法停止养护。且不易在楼板上停止施任务业或堆放重物,以削减或避免钢筋混凝土布局发生缩短变形裂痕。
When removing concrete form, attention should be paid to the time and sequence of formwork removal. For beams, wallboards and other structures, the formwork removal time should be appropriately extended, and measures should be taken to maintain after the formwork removal. And it is not easy to carry out construction work or stack heavy objects on the floor, so as to reduce or avoid the shrinkage deformation cracks of reinforced concrete structure.
5、对固结的时候
5. On the time of condensation
春季气温多变,日夜温差大,早晨气温较低,易使固结时候耽误,应注重做好保温养护任务。商品混凝土公司也采用办法,严酷节制坍落度及外加剂用量,出格是利用缓凝型减水剂时,更要注重温度对混凝土固结时候的影响。若是混凝土坍落度丧失大,任务性不能知足施工请求,请实时告诉商品混凝土公司,停止调剂。工地不要随便加水或增加外加剂调剂混凝土坍落度,以避免呈现混凝土品质题目。
In spring, the temperature is changeable, the temperature difference between day and night is large, and the temperature at night is low, which is easy to prolong the setting time. Commercial concrete companies also take measures to strictly control the slump and the amount of additives, especially when using retarded superplasticizer, more attention should be paid to the influence of temperature on the setting time of concrete. If the concrete slump loss is large and the workability can not meet the construction requirements, please timely inform the commercial concrete company for adjustment. Do not add water or additives at will to adjust the slump of concrete, so as to avoid concrete quality problems.

 